top of page
south-east-corner-dusk_966x668.jpg

Royal Liverpool University Hospital

2013 nbbj

2013 Liverpool Hospital: Welcome

The project

  • Location: Liverpool, UK

  • Size: 95,000SM

  • Type: Healthcare

  • Components: 646 beds, 18 operating theatres, emergency department

  • Sustainability: BREEAM Healthcare Excellent Rating

  • Team size: 40


Role in the Project

  • From July of 2013 to October 2015, assisting with BIM onwards

  • Stages: 3 and 4

  • Architectural Technician / Design assistant

Develop the Technical design of the exterior components of the building.Develop specifications for the exterior components of the building. Production of documentation for the envelope of the building. Samples (produced on Revit):

Coordination with structural engineers. Coordination with MEP for plant design and incoming services

  • BIM Coordinator

Set processes to improve the efficiency of the team and achieve consistency between the different sub-teams

Run Navisworks clash detection with consultants

Production of models for visualisation

Manage the exchange of models with consultants and engineers.


Software used 

  • Documentation: Revit,  Autocad

  • Clash detection: Navisworks

  • Data entry: CodeBook, NBS Create

2013 Liverpool Hospital: Text
2013 Liverpool Hospital: Selected Work
bottom of page