Royal Liverpool University Hospital
2013 nbbj
2013 Liverpool Hospital: Welcome
The project
Location: Liverpool, UK
Size: 95,000SM
Type: Healthcare
Components: 646 beds, 18 operating theatres, emergency department
Sustainability: BREEAM Healthcare Excellent Rating
Team size: 40
Role in the Project
From July of 2013 to October 2015, assisting with BIM onwards
Stages: 3 and 4
Architectural Technician / Design assistant
Develop the Technical design of the exterior components of the building.Develop specifications for the exterior components of the building. Production of documentation for the envelope of the building. Samples (produced on Revit):
Samples (produced on Revit):
Coordination with structural engineers. Coordination with MEP for plant design and incoming services
BIM Coordinator
Set processes to improve the efficiency of the team and achieve consistency between the different sub-teams
Run Navisworks clash detection with consultants
Production of models for visualisation
Manage the exchange of models with consultants and engineers.
Software used
Documentation: Revit, Autocad
Clash detection: Navisworks
Data entry: CodeBook, NBS Create