top of page
exterior-winter01_v4.jpg

The Powerhouse

2019 Pilbrow & Partners

2019 Powerhouse: Welcome
exterior-winter02_v4_edited.jpg

Services

Design Development

The Foundation for Success

  • Location: Hayes, UK

  • Size: 2642 sqm

  • Type: Co-working spaces

  • Team: size 7

A new co-working hub within a refurbished power house. Dedicated to deliver the future workplace environment for start ups and young emerging companies, the Power House provides flexible and co-working spaces that promote and facilitate connections between employees, students, organisations and businesses.

Project Inception

Solving Problems Before They Exist

Mikel Beaumont works hard to ensure every project meets the agreed-upon budget and deadline. That’s why they believe the Project Inception is such a crucial stage of every venture. Contact them to find out more about their methodology and approach.

Schematic Design

Smart Solutions Guaranteed

Schematic Design is a vital stage in every project, and the service that Mikel Beaumont enjoys the most. No matter the size or scope of your planned project, get in touch to discuss what they can add to your plans.

2019 Powerhouse: Services

The Project

  • Location: Hayes, UK

  • Size: 2642 sqm

  • Type: Co-working spaces

  • Team: size 7

A new co-working hub within a refurbished power house. Dedicated to deliver the future workplace environment for start ups and young emerging companies, the Power House provides flexible and co-working spaces that promote and facilitate connections between employees, students, organisations and businesses.

​

Role in the Project

  • Dates: 2019 

  • Stages: Stage 3 and 4

  • BIM Coordinator 

Initial set up of models and model division strategy. Set processes to improve the efficiency of the team and achieve consistency on documentation following the office standards.

Train and assist the team with any day a day issues. Assist with modelling and the production of documentation when required. Assist with the production of models for visualisation .

Manage the exchange of models with consultants and client. Manage Clash detection.

Challenges: Project with Existing Survey model and Point cloud survey. Divided in several demolition and construction phases.

​

Software used 

  • Design: Revit, Microstation

  • EDMS: Aconex, Newforma

  • Clash Detection: Navisworks; 3D Repo

  • Computational Design:  Dynamo

  • Visualisation: Enscape

2019 Powerhouse: Text
2019 Powerhouse: Selected Work
bottom of page