top of page
01409_127kensingtonhighstreet_vv003_prop

Kensington High Street

2019 Pilbrow & Partners

2019 Kensington HS: Welcome

The Project

  • Location: Kensington, London

  • Size: —

  • Type: Retail / Offices

  • Team: size 7


Role in the Project

  • Dates: 2019 

  • Stages: Stage 5

  • BIM Coordinator 

Train and assist the team with any day a day issues. Assist with modelling and the production of documentation when required. Assist with the production of models for visualisation .

Manage the exchange of models with consultants and client. Manage Clash detection.


Software used 

  • Design: Revit, Microstation

  • EDMS: Aconex, Newforma

  • Clash Detection: Navisworks; 3D Repo

  • Computational Design:  Dynamo

  • Visualisation: Enscape

2019 Kensington HS: Text
2019 Kensington HS: Selected Work
bottom of page