top of page
C2 Market Building
2019 Pilbrow & Partners
2019 C2 Market Building: Welcome
The project
Location: Cambridge, UK
Size: 37,500 SM
Components: 93-bed private hospital, 200 bed hotel, conference and medical education centre, retail, cafes, parking
Sustainability: On target for BREEAM Excellent
Team size: 20
Role in the Project
Dates: From April 2014, assisting with BIM onwards
Stages: 3 and 4
BIM Coordinator
Develop the BIM Execution Plan
Rebuild models during change of stages, Rebuild and Coordinate with Explore (prefabricated concrete panels company) the panelisation of the facade achieving the most efficient model for both companies.
Set processes to improve the efficiency of the team and achieve consistency between the different sub-teams
Manage the exchange of models with consultants. Run Navisworks clash detection with consultants. Production of models for visualisation. Manage the exchange of models with consultants and engineers
Architectural Technician / Design assistant
Developing envelope packages technical drawings, details, specifications, coordination with MEP and structural engineers.
Production of documentation. Develop the Technical design of the exterior components of the building. Develop specifications for the exterior components of the building. Coordination with structural engineers. Coordination with MEP for plant design and incoming services
Software used
Documentation: Revit, Autocad
Visualisation: Revit, Photoshop
Clash detection: Navisworks
Data entry: CodeBook
2019 C2 Market Building: Text
2019 C2 Market Building: Selected Work
bottom of page